Stormwater and Flooding Analysis

FastTrack
Environmental Assessment
Auckland
20 Jan 2026·First seen: 21 Jan 2026
107 pages·5.0 MB
Summary

Hydraulic analysis of stormwater and flood effects from the BRT corridor construction and operation, covering the Puhinui Stream and Otahuhu Creek catchments. The analysis identifies required culvert upgrades and recommends a corridor-wide stormwater management plan.

Document Preview
Page 1 preview
Page 1
Page 2 preview
Page 2
Page 3 preview
Page 3
Page 4 preview
Page 4
Page 5 preview
Page 5
Page 6 preview
Page 6

+101 more pages

Classification

Process Type

Environmental Assessment

Document Type

Assessment

Category

Reports And Advice

Notice Type

Topics

Domain

Water

Activity

Kayaking Rafting
Document Info
RegionAuckland
Source
FastTrack
File Size5.0 MB
Pages107
Document Date20 Jan 2026
First Seen21 Jan 2026